MỎ ĐÁ ĐỒI SÁO – KHU TỔ HỢP SẢN XUẤT GANG THÉP HÒA PHÁT DUNG QUẤT Vị trí: Khu kinh tế Dung Quất, xã Bình Đông, huyện Bình Sơn, tỉnh Quảng Ngãi Sản lượng sản xuất hàng tháng: 200.000 m3/tháng Loại đá đã cung cấp bao gồm: Đá 4 x 6 Đá 2 x 4 Đá 1 x 2 Cấp phối đá dăm loại 1 Cấp phối đá dăm loại 2 Tổng sản lượng đá đã cấp: 2 triệu m3 Hệ thống nghiền sàng Trạm nghiền 1.000 tấn/h ( 2 x 500 tấn/h) Trạm nghiền 500 tấn/h ( 2 x 250 tấn/h) Dự án đang cung cấp phục vụ thi công Dự án Khu liện hợp sản xuất gang thép Hòa Phát Dung Quất.
Project Information. - Employer: Nam Ngiep 1Power Company - Main Contractor: Obayashi Corporation. - Construction Location: Laos PDR Scope of work: Include 2 units with the total capacity of 290 MW in which 01 main power station (272.8 MW) and 01 re-regulation power station (17,6 MW), RCC Dam with the height of 167 m. - Construction time: 2014-2018. Scope of Song Da 5 works: - Construction of upstream cofferdam - Construction of Main Dam Excavation - Construction of RCC concrete for main dam, including the installation, operation and dismantlement of RCC batching plant 720 m3/h and RCC conveyor system with the length of 2,4 km. - Construction of CVC concrete for Spillway, water intake, penstock. - Construction of CVC, steel structure and finishing work for Main Power house. - Consolidation grouting and curtain grouting at Dam Foundation, - Construction and finishing work at re-regulation power station. Completion Quantity: - Excavation quantity: 2,003,898 m3 - RCC Quantity: 2.378.175 m3 - CVC Quantity: 154,000 m3. - Consolidation and curtain grouting: 31.885,67 m
Project of Hoa Phat - Dung Quat Steel Production Complex is located in Dung Quat Economic Zone, Binh Dong commune, Binh Son district, Quang Ngai province. I. MAIN INFORMATION Owner: Hoa Phat Dung Quat Steel Joint Stock Company Package name: Processing and processing of finished products - Hoa Phat - Dung Quat Steel Complex. II. SCOPE OF WORK - Installation and operation of stone processing stations with the capacity of 1000 tons / h - Productivity: 120,000 m3 finished products / month
I. Main Information Employer: VNT19 Pulp - Paper JSC Location: Phuc Long hamlet - Binh Phuoc ward - Binh Son district - Quang Ngai province Total investment: 7.900 bil. VND Capacity: 350.000 ton/ year II. Scope of work : Construction of substructures and superstructures. Construction time: Jan/2017 – Oct/2017
Main information: • The Owner: Power Construction JSC no.1 • Construction site: Ly Bon town – Bao Lam district – Cao Bang province • Total investment: around 2000 billion VND • Construction period: 2014 – 2016 • Installed capacity: 46 MW • Hydraulic turbo-alternator: 02 turbo Scope of work of Song Da 5: Construction of entire main works
I. Main Information - The Employer: Nam Cong Son La Hydropower JSC - Location: Pa Cong town, Huoi Mot ward, Song Ma district, Son La province - Installed capacity: 4 MW - Number of units: 02 - The annual output: 14.917 mil. kWh - Construction time: 01/08/2017 – 01/09/2018 II. Scope of Song Da 5 works - Package: Construction of spillway, intake, penstock, powerhouse, tailrace, switchyard and temporary works. - Total construction volume: + Excavation: 72.200 m3 + Concrete: 15.000 m3