Main information
• The Owner: EVN
• The Main Contractor: song Da corporation
• Total investment: 7.523 billion VND
• Construction site: Na Hang district, Tuyen Quang province
• Construction period: 2003 -2009
• Hydraulic turbo-alternator: 03 turbo
• Installed capacity Nlm = 342 MW
• Average of annual power production: E0 = 1,295 billion kW
Scope of work of song Da 5:
- Construction of Main works: Waterway Power house, tunnel excavation, turbine room, traffic tunnel
- Production of construction materials