SONG CHAY 5 HYDROPOWER PROJECT

Main information:

• The Owner: Song Da 5 construction investment and energy development JSC

• Construction site:  Theng phang and Ngam chien town – XinMan district – Ha Giang province

• Total investment: 398 billion VND

• Construction period: 2009 – 2012

• Installed capacity: 16 MW

• Hydraulic turbo-alternator: 02 turbo

• Average of annual power production: 60,14 million kWh.

Scope of work of Song Da 5:

- Construction of entire main works