Main information:
• The Owner: EVN
• Total investment: 4.932 billion VND
• Construction site: Ta Po town, Nam Giang district, Quang Nam province
• Construction period: 2010 - 2014
• Hydraulic turbo-alternator: 2 turbo
• Installed capacity Nlm = 156MW
• Average of annual power production: E0 = 586,25 million kWh
Scope of work of song Da 5:
- Construction of main works: Intake, Power house of waterway.
- Exploitation and production of materials used in construction.