Main Information:
• The Owner: Se San 3A Hydropower JSC
• Construction site: Ia Khai – Iagrai town - Gia Lai province and Mo Rai town - Sa Thay district - Kom Tum province
• Total investment: 1.945,95 billion VND
• Construction period: 2003 – 2007
• Installed capacity: 108 MW
• Hydraulic turbo-alternator: 03 turbo
• Average of annual power production: 479.3 million kW
Scope of work of Song Da 5:
- Construction of concrete work for: Power house, waterway, dam
- Exploitation and construction of materials used for construction