Main information:
- The Owner: Nghe An corporation of power development JSC
- Construction site: Luong Minh town, Tuong Duong district, Nghe An province
- Total investment: 513 billion VND
- Hydraulic turbo-alternator: 02 turbo
- Installed capacity: 20 MW
- Construction period: 2011 – 2015
Scope of work of Song Da 5:
- Construction of main woks: dam, spillway, intake, pen stock, power house, discharge canal and substation.