- Employer: Nam Ngiep 1Power Company
- Main Contractor: Obayashi Corporation.
- Construction Location: Laos PDR
- Construction time: 2014-2018.
- Construction of upstream cofferdam
- Construction of Main Dam Excavation
- Construction of RCC concrete for main dam, including the installation, operation and dismantlement of RCC batching plant 720 m3/h and RCC conveyor system with the length of 2,4 km.
- Construction of CVC concrete for Spillway, water intake, penstock.
- Construction of CVC, steel structure and finishing work for Main Power house.
- Consolidation grouting and curtain grouting at Dam Foundation,
- Construction and finishing work at re-regulation power station.
- Excavation quantity: 2,003,898 m3
- RCC Quantity: 2.378.175 m3
- CVC Quantity: 154,000 m3.
- Consolidation and curtain grouting: 31.885,67 m