Main information:|
• The Owner: Can Don hydropower JSC
• Total investment: 1035.49 billion VND
• Construction site: Da Kim town, Phuoc Long district, Binh Phuoc province.
• Construction period: 2000 - 2004
• Hydraulic turbo-alternator: 02 turbo
• Installed capacity Nlm = 77.6 MW
• Average of annual power production: E0 = 321.2 million kWh
Scope of work of Song Da 5:
Construction of main works