Main information:

• The Owner: Power Construction JSC no.1

• Construction site:  Duc Hanh town and Ly Bon town – Bao Lam district – Cao Bang province

• Total investment: around 276 billion VND

• Construction period: 2016 – 2018

• Installed capacity: 8 MW

• Hydraulic turbo-alternator: 01 turbo

• Average of annual power production: 33.42 million kWh.

Scope of work of Song Da 5:

Construction of entire main works