BAO LAM 3 HYDROPOWER PROJECT

  • Main Information

- The Employer: Power Construction No. 1 JSC

- Construction Location: Between Duc Hanh Commune, Bao Lam district, Cao Bang Province and Niem Tong Commune, Meo Vac District, Ha Giang Province.

- Total Investment: ~ VND 2000 billion

- Installed capacity: 46 MW.

- Number of units: 02

- The annual output: 192.175 million kWh

- Construction time: 2015-2017

  • Scope of Song Da 5 works

- Foundation excavation for main works:  Powerhouse, Tailrace, Power Station, Spillway, Main Dam, Diversion Culvert, Switch yard.

- Construction of Concrete structure for main works: Power house, Tailrace, Spillway, Main Dam, Diversion Culvert, Switch yard.

  • Completed Main Quantity by Song Da 5

- Earth and Rock Excavation Quantity: 375.806m3 with the height of Excavation slope: 100 m.

- Total CVC Concrete quantity: 183,800,00 m3.

  • Construction Rate

- The average construction rate: 11.000 m3/month.

- The maximum construction rate: 16.000 m3/month.