Main information:
• The Owner: Power Construction JSC no.1
• Construction site: Ly Bon town – Bao Lam district – Cao Bang province
• Total investment: around 2000 billion VND • Construction period: 2014 – 2016
• Installed capacity: 46 MW
• Hydraulic turbo-alternator: 02 turbo
Scope of work of Song Da 5: Construction of entire main works